110 kV Power Line Construction in Dětmarovice
The work included earthworks, piling, sheet piling and removal of reinforced concrete to the landfill,

Demolition of Building G REA in Prague
The work included the demolition of Building G, which originally served as a gatehouse at the entrance to the ČEPS site

Demolition of Cooling Towers in Mochovce
As part of the demolition of the reinforced concrete construction on cooling towers 12 and 22, preparatory work was first carried out by demolishing two reinforced concrete columns to create an opening for the entrance to the so-called 'pool'.

Demolition of cooling towers Spolana Neratovice
As part of the overall project 'Reconstruction of fan cooling towers'

Demolition of DO 01 Hall in Ostrava Kunčice
The subject of the work was the removal of the construction 'DO 01 - Mechanics Hall V (Hrubovna)' including the associated outdoor crane track and related construction objects.

Demolition of DO04, DO12 and DO13 Structures in Ostrava Vítkovice
Demolition of steelworks buildings and adjacent buildings in the former Vítkovice Heavy Machinery site, mainly steel structures.

Demolition of Kovárna Hall in Ostrava Kunčice
The construction objects SO 01 - Forge Hall, which consists of five interconnected halls, were removed as part of the implementation of the work.

Demolition of the chimney in Kovárna
Part of the work on the removal of the object NS 340 Kunčice Forge and the object DO 01 of the mechanics hall

Demolition of two buildings on the premises of Czechplast in Karviná
The work involved the demolition of two multi-storey buildings, each approximately 20 metres high.

Demolition Ostrava Místecká
Part of it was the implementation of demolition works on the buildings, namely cooling towers TG7 and TG8, the pumping station building and the energy bridges.

V403/803 - 400kV line PRN - NOS - section 1 - st.no.2 - st.no.84
The construction works on this project consisted in doubling the line on the V403/803 route in the Olomouc and Zlín regions with a length of approximately 27 km.

V413 - modernisation to higher parameters - Section II, p.b. No. 355-477 (P.0496) construction and assembly works
The subject of the contract was the partial or complete removal of the existing foundations, construction of new foundation structures,

V423 - modernisation to higher parameters, 2nd stage + coatings
The subject of the work was the modernisation of 400kV lines in the South Moravian region on the route from TR Čebín - st.no. 843 with a length of approx. 13 km.

V450/428 - line doubling - section VYS - st.č.74
During the first stage of the contract, which took place on the route from the Výškov transformer station to mast No. 74, the existing lines were first removed.

V453 - modernisation of the line (construction part)
As part of the V453 line upgrade, the old foundations of selected pylons were removed in 2024 and new pylons were subsequently constructed.

V460 - modernisation (TR Nošovice - TR Albrechtice) - line length 16,42km
The subject of this contract was the modernisation of the line to higher technical parameters, in the form of reconstruction of the footings of a total of 50 masts on the Nošovice - Albrechtice route.

V487/488 - line doubling - section 1 (P.0391) construction and assembly works
Within the scope of the Work, the conversion of the existing double line V223/224 to the double line 400 kV V487/488 was carried out

V490/491 - 400 kV line PRE - VIT - 1st stage (TR Vítkov - station No. 99)
The construction work for this extensive line included landscaping, including the construction and modification of access roads to ensure smooth access to the site.

V595-596 Šumperk - Raječek - Reconstruction of lines - construction, painting and geodetic works
The subject of the work was the reconstruction of the foundation structures of the existing transmission line on the route TR Šumperk - TR Raječek.

V641/642 - Lískovec - Vratimov
Within the framework of the contract, construction works were carried out including grounding adjustments, repairs of damaged parts of steel structures and their subsequent treatment with coatings.


Complex realization from A to Z

Many years of experience

Individual approach
Why choose Build Synergy
Build Synergy s.r.o. is a company that stands out for its expertise and years of experience in the industry. Our team is made up of professionals with an innovative approach who focus on efficient and quality project execution; We utilize modern technology and state-of-the-art equipment that enables us to work quickly, accurately and with maximum efficiency.
An important part of our company philosophy is an individual approach to each client. Build Synergy emphasizes transparent communication, fair pricing and flexible solutions that meet specific customer needs.
Our references

Demolition of DO04, DO12 and DO13 Structures in Ostrava Vítkovice
Demolition of steelworks buildings and adjacent buildings in the former Vítkovice Heavy Machinery site, mainly steel structures.

V460 - modernisation (TR Nošovice - TR Albrechtice) - line length 16,42km
The subject of this contract was the modernisation of the line to higher technical parameters, in the form of reconstruction of the footings of a total of 50 masts on the Nošovice - Albrechtice route.

V595-596 Šumperk - Raječek - Reconstruction of lines - construction, painting and geodetic works
The subject of the work was the reconstruction of the foundation structures of the existing transmission line on the route TR Šumperk - TR Raječek.